Laserfiche WebLink
Decatur,City of,Mound School Bodine Project#114675 <br /> Phase II Subsurface Investigation Report August 29 2003 <br /> adjusting the boring locations,Bodine utilized a systematic planning process to establish <br /> a seven(7) feet distance between sample locations, based upon the reported size of the <br /> UST being 550 gallons. Field adjustments for step out locations were based upon DPT <br /> refusal and observations which appeared to indicate the UST and concrete slab may still <br /> remain. The borings were abandoned by filling with bentonite chips to surface. In areas <br /> where there was an asphalt surface, asphalt patch was placed in the top 6 inches of the <br /> boring locations. Figure 1, in Attachment A, depicts the final boring locations. <br /> During installation of the borings, Bodine made several observations which appear to <br /> indicate the UST and concrete anchor slab may still be present. <br /> • Boring B3 was advanced into loose sand from 0.5 feet to 6.5 feet. At 6.5 feet the <br /> boring could no longer be advanced with significant additional force applied by the <br /> probe. When retrieving the flights,the tip of the probe appeared to have a grey <br /> substance around the edge. <br /> • Boring BS was advanced approximately 2.6 feet before encountering refusal. <br /> Additional force was applied to the probe and the probe was forced, at a slight angle <br /> to the west,past the obstruction. Upon removal of the flights from the boring, a 1.5 <br /> inch diameter shaving of inetal was found in the probe tip. The soil which was <br /> recovered had a dark iron oxide appearance, indicating potential contact with a buried <br /> iron/steel object. <br /> • Boring B8 was advanced into loose sand from 0.5 feet to approximately 4 feet. At 4 <br /> feet probe refusal was encountered and the boring could not be advanced any further. <br /> • Boring B9 was advanced to approximately 4 feet. At 4 feet probe refusal was <br /> encountered and the boring could not be advanced any further. The core removed I <br /> from the probe contained brown/orange silty clay. <br /> 3.2 Data Collection: <br /> As borings were completed, Bodine conducted field observations of the unconsolidated I! <br /> geologic material and screened the cores with a photo-ionization detector(PID) at 6 inch <br /> intervals. During the investigations, no readings, above background,were indicated for <br /> any of the borings. The samples were selected from intervals which indicated the highest <br /> potential for contamination and consistent with the sampling recommendations of the <br /> IEPA Leaking Underground Storage Tank(LUST) Program. <br /> Since the UST was reported to contain diesel fuel, Bodine selected the indicator <br /> contaminates for the IEPA LUST Program, BTEX and PAHs. Soil samples for BTEX <br /> analysis were collected first, utilizing Terracore samplers with sodium bisulfate and <br /> methanol preservation in accordance with SW-846 Method 5035/8260. The PAH <br /> samples were collected last and placed into nine (9) ounce laboratory certified glass <br /> 3 <br /> E3O(7lNE f"NVIFiONMEN7�Al SFHVICES, INC.� �__ ��___ <br />