My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-88 AUTHORIZING THE EXECUTION OF CONSULTING SERVICES AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-88 AUTHORIZING THE EXECUTION OF CONSULTING SERVICES AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 4:20:12 PM
Creation date
1/13/2016 4:20:10 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-88
Res Ord Title
AUTHORIZING THE EXECUTION OF CONSULTING SERVICES AGREEMENT ADDITIONAL RAW WATER SUPPLY
Approved Date
6/16/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Task 3: Confirm Basic Desi�n Parameters for Off-Stream Reservoir and Dred�posal Site <br /> MWH will confirm basic design parameters needed for the computation of volume and area requirements far ' <br /> off-stream storage reservoir and dredge disposal facilities. Specific activities to be completed as part of this <br /> task will include: <br /> Sub-task 3.1 —MWH will review the scope of the proposed dredging program with City staff. Consideration <br /> will be given to the proposed near-term dredging program and the potential for maintenance dredging at <br /> some time in the future. Results from this review will be used to determine project active reservoir storage <br /> volume for a 50-year planning period. <br /> Sub-task 3.2 — Based on the results of Task 3.1, MWH will project probable reservoir yield from Lake <br /> Decatur for drought conditions with an annual probability of occurrence of 4%,2% and 1%. <br /> Sub-task 3.3—MWH will review recent projections of water withdrawal requirements for Lake Decatur with <br /> the City and assist in the selection of requirements to be used in evaluating off-stream storage requirements. <br /> MWH will perform a comparison of the selected water withdrawal requirements and projections of reliable <br /> reservoir yield developed under Sub-task 3.2. Results from the comparison will be used to confirm the <br /> design volume required for an off-stream storage reservoir intended to supplement existing supplies during <br /> drought conditions with an annual probability of occurrence of 4%, 2% and 1%. <br /> Sub-task 3.4 — MWH will perform a preliminary analysis of excavation/embankment options to deternune <br /> the approximate land area required for the off-stream storage reservoir options being considered. MWH will <br /> document the results of this analysis and analyses completed under Sub-tasks 3.1, 3.2 and 3.3 in a technical <br /> memorandum. A draft of the technical memorandum will be prepared for review with the City. Following <br /> receipt of comments, MWH will revise the memorandum to serve as a chapter in the final feasibility study <br /> report. <br /> Sub-task 3.5 — Results of previous investigations of sedimentation and dredging options for Lake Decatur <br /> are documented in the Illinois State Water Survey Contract Report 2002-09 Sedimentation Survey of Lake <br /> Decatur's Big and Sand Creek Basins, Macon County, Illinois (Bogner, 2002). MWH will review this <br /> document, as well as supplemental information provided by the City related to past and proposed dredging <br /> activities, to define the likely settling and environmental characteristics of the dredge material that will <br /> require disposal in the proposed disposal facility. These characteristics will be used together with the City's <br /> estimates of dredge disposal volumes as the basis for preliminary sizing of the proposed, new dredge <br /> disposal site. Depending on the completeness of available data, MWH may recommend that the City <br /> consider supplemental material sampling and testing. <br /> MWH will document the results of this analysis in a technical memorandum for review by the City. <br /> Following receipt of comments, MWH will revise the memorandum to serve as a chapter in the final <br /> feasibility study report. <br /> Task 4: Sitin��Analysis for Dred e�D�isposal and Off-Stream Stora�e Facilities <br /> Based on consideration of technical factors, consideration of anticipated regulatory and permitting <br /> requirements, and input from City staff and the Water Resources Advisory Committee regarding non- <br /> technical issues, MWH will develop three options for siting of a new dredge disposal facility and a new off- <br /> stream storage reservoir. Options may include adjacent siting of both facilities or separate siting of the <br /> dredge disposal and off-stream storage reservoir facilities. <br /> Key elements of the siting analysis will include the following sub-tasks. <br /> 12 <br /> Consulting Services(CPFF)(Rev. 1-14-2003) <br />
The URL can be used to link to this page
Your browser does not support the video tag.