Laserfiche WebLink
3. ICRR-Modify equipment to accept three-wire supervisory connection from the <br /> traffic controller. <br /> 4. City-Install near right and far right "No Right Turn" blank-out signs for eastbound <br /> and westbound traffic. <br /> 5. City-Update any advance railroad striping or warning signs as necessary. <br /> 6. City-Add "Caution Walk Time Shortened When Train Approaches" signs near all <br /> pedestrian signals. <br /> �7tn �trPPt at Fariac Park���a�i <br /> 1. City-Install a new controller and cabinet, complete with remote monitoring <br /> capabilities and security. Add phone service. <br /> 2. City-Install a three-wire supervisory interconnect to NS <br /> 3. NS-Modify equipment to accept three-wire supervisory connection from the <br /> traffic controller. <br /> 4. City-Install two eastbound "No Left Turn" blank-out signs and two westbound "No <br /> Right Turn" blank-out signs. <br /> 5. City-Update any advance railroad striping or warning signs as necessary. <br /> 6. City-Add southbound pavement crosshatched striping in the vicinity of the <br /> crossing. <br /> 7. City-Add two southbound "Do Not Stop on Tracks" signs (one before the <br /> crossing and one after the crossing). <br /> SPCf—�on'� The City, NS and ICRR have prepared estimates of cost to accomplish the <br /> proposed work which they may be required to perForm; said estimates are attached as <br /> Exhibits A, B and C respectively, and shall upon Order, according to the requirements <br /> contained therein, prepare general plans and any required specifications for the <br /> proposed improvements for the approval of the Commission and the Department. <br /> Section 4� The City, NS and ICRR shall upon entry of the Commission's Order, <br /> according to the requirements contained therein, proceed toward the completion of <br /> their work proposed herein accomplishing the improvements with their own forces or <br /> appropriate contracted services and agree that an appropriate time for the submission <br /> of plans should be three (3) months, the submission of progress reports should be six <br /> (6) months and for completion of the work should be twelve (12) months from the date <br /> the Commission's Order is entered approving this Agreement. Said progress reports <br /> 3 <br />