My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-39 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-39 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 10:53:34 AM
Creation date
1/14/2016 10:53:33 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-39
Res Ord Title
AUTHORIZING AGREEMENT - BLACKSTONE GROUP - MOUND CENTER
Approved Date
4/7/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of Owner. <br /> Construction. <br /> (f� To construct and complete the Construction Work, and to assist the <br /> project engineer in supervising the Construction Work. Such construction shall be <br /> performed by the subcontractors approved by Owner pursuant to and in compliance with <br /> the Plans. <br /> Proiect Control. <br /> (g) To schedule and conduct preconstruction and progress meetings with <br /> Owner and project engineer at which time the parties can discuss jointly such matters as <br /> procedures, progress, variance between quality of workmanship and material delivered and <br /> that which is anticipated, and other problems and scheduling. Owner retains the right, <br /> but not the obligation, to separately inspect the Construction Work. If as a result of such <br /> inspection or conversations with Developer or the project engineer, Owner determines <br /> that there are defect(s) and/or deficiency(s) in the Construction Work, then Owner shall <br /> notify Developer, who shall require the applicable subcontractor to stop the Construction <br /> Work or any portion thereof that appears to be deficient and promptly correct it to the <br /> reasonable satisfaction of Developer and Owner. Regardless of whether Owner so notifies <br /> Developer, if Developer determines that there are defects and/or deficiencies in the <br /> Construction Work that justify requiring the applicable subcontractor to stop the <br /> Construction Work or any portion thereof that appears to be deficient, then it shall cause <br /> the applicable subcontractor to stop the Construction Work and promptly correct it to the <br /> reasonable satisfaction of Developer and Owner. <br /> (h) To provide regular monitoring of the schedule as the Construction <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.