Laserfiche WebLink
� <br /> Attachment 1 <br /> Page 2 of 3 <br /> work than budgeted may be required. We will keep you advised as to the status of the budget for <br /> review of shop drawings and change orders and will bill you for actual time spent and direct <br /> expenses, which may be more or less than budgeted. <br /> MWH office staff will also be available to address questions that may arise in the field during <br /> construction. This includes senior construction management personnel, civil/structural <br /> engineers,geotechnical engineers,and other support staff as needed for particular situations that <br /> may arise. We have budgeted 24 hours of senior engineer time for this effort. <br /> At the completion of construction, MWH will prepare record drawings using prints of the <br /> construction drawings marked-up by the Contractor to show the actual conditions as constructed <br /> (as reported by the Contractor). MWH will prepare and submit two(2)sets of draft record prints <br /> to the City for review,then one original mylar and two(2)sets of prints of the final drawings that <br /> incorporate the City's comments. A total of 8 hours of engineering time and 24 hours of drafting <br /> time have been budgeted for this task. <br /> Task 2—Field Support During Construction <br /> MWH will attend monthly meetings at the site with the City and the Contractor during <br /> construction to discuss the progress of the work, payment requests, and any actual or potential <br /> construction problems and their resolution. MWH will prepare and issue minutes of these <br /> meetings. These meetings are anticipated to include a project start-up meeting, two interim <br /> meetings(end of one month and end of two months)and a substantial completion inspection(at <br /> approximately three months after start of construction). <br /> We anticipate that the City will have a Project Representative or Coordinator at the site during <br /> construction to observe the Contractor's work during construction,provide quality control and <br /> quality assurance,and to address day-to-day construction issues. If desired,MWH can provide a <br /> full time Resident Project Representative with terms provided upon request. <br /> In addition, MWH will make visits to the site at critical points in the construction, when <br /> requested by the City, if they do not coincide with the monthly meetings. For this effort, we <br /> have budgeted two additional visits to the site by two engineers. These site visits may also be <br /> used to assess unexpected or unusual conditions that may be discovered during the course of the <br /> work, with which the City would like MWH's assistance in resolving. <br /> When the work is deemed substantially complete by the Contractor,MWH will inspect the site <br /> with the City and prepare a punch list of items to be completed to meet Substantial Completion <br /> requirements. If desired,a final inspection site visit can also be made,but is not included in this <br /> estimated budget. <br /> O:�ProjecWumberV 8500-18599V 8552\CM Services Budget:u�d Scope.DOC <br />