Laserfiche WebLink
Miscellaneous Manhole Replacement Engineer's Estimate Bodine Services,Inc. Entler Excavating Co.,Inc. I <br /> City Project 2001-41 5330 E.Firehouse Road 819 N.Sunnyside �I <br /> City Engineering Division Decatur,Illinois 62521 Decatur,IL 62522 <br /> Bid Date.............Monday,October 8,2001 <br /> Time.....................................10:00 a.m. 5%BID BOND <br /> General Capital Fund.......................79 Apparent Low Bidder <br /> Object Code.........................40000-613 <br /> ITEM PAY ITEM UNIT QUANTI UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL <br /> NUMBER <br /> 42000300 PORTLAND CEMENT CONCRETE SY 110 <br /> PAVEMENT,8" $70.00 $7,700.00 $36.50 $4,015.00 $50.00 $5,500.00 <br /> 44000100 PAVEMENT REMOVAL SY 110 <br /> $25.00 $2,750.00 $17.50 $1,925.00 $2.00 $220.00 <br /> 44001700 COMBINATION CURB&GUTTER FT 24 <br /> REMOVAL&REPLACEMENT $24.00 $576.00 $25.00 $600.00 $38.00 $912.00 <br /> 60218400 MANHOLES,TYPE A,4'DIAMETER, EA 10 <br /> TYPE 1 FRAME,CLOSED LID $5,000.00 $50,000.00 $1,500.00 $15,000.00 $3,000.00 $30,000.00 <br /> 60218401 ADDITIONAL DEPTH OF MANHOLE FT 16 $150.00 $2,400.00 $200.00 $3,200.00 $200.00 $3,200.00 <br /> 67100100 MOBILIZATION EA �� $600.00 $6,000.00 $350.00 $3,500.00 $200.00 $2,000.00 <br /> 70106101 TRAFFIC CONTROL&PROTECTION, EA 5 <br /> STANDARD 701501 $200.00 $1,000.00 $500.00 $2,500.00 $200.00 $1,000.00 <br /> 70106201 TRAFFIC CONTROL&PROTECTION, EA 5 <br /> STANDARD 701606 $500.00 $2,500.00 $500.00 $2,500.00 $200.00 $1,000.00 <br /> Z2080000 SELECTED GRANULAR MATERIAL CY 330 $35.00 $11,550.00 $20.00 $6,600.00 $35.00 $11,550.00 ', <br /> SEWER CONSTRUCTION-PIPE <br /> Z5500006 FT 5 <br /> SEWERS,6" $60.00 $300.00 $25.00 $125.00 $20.00 $100.00 i <br /> Z5500008 SEWER CONSTRUCTION-PIPE FT 55 <br /> SEWERS,8" $75.00 $4,125.00 $28.00 $1,540.00 $30.00 $1,650.00 <br /> Z5500010 SEWER CONSTRUCTION-PIPE FT 40 <br /> SEWERS,10" $95.00 $3,800.00 $30.00 $1,200.00 $40.00 $1,600.00 , <br /> Z5500012 SEW ER CONSTRUCTION-PIPE FT 20 <br /> SEWERS,12" $110.00 $2,200.00 $32.50 $650.00 $48.00 $960.00 <br /> Z5500015 SEWER CONSTRUCTION-PIPE FT 20 I�� <br /> SEWERS,15" $125.00 $2,500.00 $35.00 $700.00 $55.00 $1,100.00 , <br /> Z5500018 SEWER CONSTRUCTION-PIPE FT 5 � <br /> SEWERS,18" $150.00 $750.00 $40.00 $200.00 $61.00 $305.00 I <br /> Z5500812 ADDITIONAL EXCAVATION DEPTH- FT 110 <br /> PIPE SEWER.8'TO 12' $10.00 $1,100.00 $40.00 $4,400.00 $30.00 $3,300.00 <br /> Z5501216 ADDITIONAL EXCAVATION DEPTH- FT 5 <br /> PIPE SEWER,12'TO 16' $20.00 $100.00 $52.00 $260.00 $40.00 $200.00 I <br /> TOTAL BID As Corrected $99 351.00 $48 915.00 $64 597.00 I <br /> Percent Over or Under ENGINEER'S ESTIMATE 50.77 34.98 <br /> j.�� ��s2�/ /D -j-ra/ <br /> Matthew C.Newell, City Engineer Date <br />