Laserfiche WebLink
. � . � i <br /> . � � � <br /> , <br /> ; <br /> Task 3 Conceptual Studies of Key Elements (illustrative plans and sketches�potentially <br /> including: <br /> • Redeveloped Longview Place <br /> • Major public streets—development, streetscape, transportation improvements , <br /> • New housing types <br /> • Significant public spaces <br /> • Similar studies <br /> • Potential significant development projects <br /> Task 4 Coordinate phasing with developer, city and DHA <br /> � Confirm master-planning components required for developer's tax credit submission. <br /> Although the team is not responsible for assembling the tax credit submission, the <br /> team will work with the selected developer and developer's architects to provide the <br /> necessary supporting documents that have resulted from the master planning process <br /> so far. <br /> Task 5 Submit Preliminary Revitalization Plan to the City and DHA(and IHDA) <br /> Meetings: <br /> 3.1 Client Progress Review Meeting TBD <br /> 3.2 Meetings with NNCT, REMCO and other stakeholder groups TBD <br /> I <br /> Products: � <br /> • Preliminary Revitalization Plan <br /> Cliet�t Responsibilities: <br /> • Assist GC&A with meetings, logistical support <br /> PHASE 4 Draft Near North Neighborhood Plan and Design Guidelines (Weeks I 5-20) <br /> This phase will involve refining the preferred site plan and drafting the conceptual <br /> guidelines that will lead the subsequent architectural design work of the developer's team. <br /> Task 1 Draft Conceptual Design Guidelines <br /> The creation of the conceptual design guidelines would include consultation with the <br /> selected developer and developer's architects. The team is committed to working closely <br /> with the developer to ensure the design guidelines assert an achievable vision for the <br /> neighborhood. <br /> Task 2 Further refine site plan - <br /> Task 3 Hold a series of briefings and review workshops <br /> • Meet with the City, DHA,NNCT,REMCO, and other stakeholder groups <br /> Task 4 Hold Public Meeting#3 TBD <br /> • Meet with the public to present conceptual design guidelines and refined plan <br /> Goody, Clancy&Associates 7 <br /> Decatur Near North Neighborhood Plan <br /> Scope of Services <br />