Laserfiche WebLink
AGREEMENT <br /> AGREEMENT made by and between the City of Decatur, Illinois, a municipal <br /> corporation("City") and Martin Equipment of Illinois, Inc. ("Martin"). <br /> For and in consideration of the promises and obligations made and assumed hereunder, <br /> the City and Martin agree as follows: <br /> 1. The City shall purchase from Martin one (1) 2001 John Deere 410G diesel <br /> powered backhoe for the price listed on Exhibit A hereto as item #1. Delivery shall be within <br /> forty-five (45) days of the date hereof, and payment shall be made within one (1) week thereafter. <br /> 2. At the end of either 5,000 operating hours or 5 years, whichever first occurs, � <br /> Martin shall repurchase said backhoe from the City for the sum of$40,000.00. � <br /> 3. Equipment purchased under this agreement will be operated by the City for � <br /> sidewalk replacement, sewer repairs, watermain repairs, other miscellaneous excavations, minor li <br /> ditching, snow removal and other purposes which the equipment is designed. <br /> 4. The City will assume responsibility for all repair costs resulting from damage due � <br /> to fire, windstorm, flood and rising waters, lightning, theft and pilferage, vandalism and � <br /> accidents. Total cost of the repairs due to the above circumstances will not be included in <br /> computing the guaranteed maximum total cost of repairs covered under the contract. �i <br /> 5. Martin shall pay for all repairs (including parts and labor) to the equipment <br /> covered by the manufacturer's warranty, and those costs shall not be included in the total cost of <br /> repairs. ', <br />