My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-18 REZONING PROPERTY - 3789 NORTH WATER STREET
COD
>
City Clerk
>
ORDINANCES
>
2003
>
2003-18 REZONING PROPERTY - 3789 NORTH WATER STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2016 3:34:15 PM
Creation date
1/28/2016 3:34:08 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2003-18
Res Ord Title
REZONING PROPERTY - 3789 NORTH WATER STREET
Approved Date
4/21/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ' ' n rin standards for storm detention. <br /> 1 D e c a t u r e n g i e e g <br /> h in n <br /> 2 The Petitioner has also provided a lig t g a d <br /> 3 photometric plan that conforms to the City' s newly <br /> 4 adopted lighting regulations regarding light levels, <br /> 5 glare and light trespass on adjoining residential I, <br /> 6 properties . , <br /> 7 There will be four free-standing signs on <br /> 8 the site . These will be accommodated at the <br /> 9 intersection of Mound and 51, totalling 140 square <br /> 10 feet in the area and 25 feet in height . A monument <br /> 11 sign at the entrance at Mound Road, totaling 86 <br /> - 12 square feet and 18 feet in height, and one monument <br /> � <br /> 13 sign for each of the smaller buildings located along <br /> 14 Mound Road, totaling 40 square feet each and a <br /> 15 maximum of 10 feet in height . <br /> 16 In reviewing applications for the B-3 <br /> 17 Planned Shopping Center District, the Plan <br /> 18 Commission is required to review specific standards <br /> 19 related to the development . Staff will briefly <br /> 20 summarize these standards as they were outlined in <br /> 21 the staff report . The proposed development is in <br /> 22 accordance with an integrated design plan and <br /> 23 closely follows the conceptual plan prepared by <br /> 24 Massie, Massie & Associates . The development has <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.