Laserfiche WebLink
1 been designed to accommodate that . The design of <br /> 2 that system is four to one slopes . Four to one <br /> 3 slopes is a slope which is maintainable with a <br /> 4 riding mower. It ' s a slope that does not give the <br /> 5 appearance of a hole, which is something we want to <br /> 6 keep away from. It will be landscaped, it will be <br /> 7 irrigated, it will be maintained by the Target <br /> 8 Corporation as part of this development . The <br /> 9 significant improvement of adjacent properties for <br /> 10 drainage is, no . 1, the surge of a storm is gone . <br /> 11 We are now catching the surge of the storm detention <br /> 12 area, but more important than that, presently, it ' s <br /> 13 all surface runoff from a portion to the south. <br /> 14 That is now being placed underground and will no <br /> 15 longer drain across the surface . So, there is II <br /> 16 significant improvements that are being provided I <br /> 17 from off-site, which will provide service to this I <br /> 18 site . As staff has indicated, there are adequate ' <br /> 19 utilities to service this facility: Twelve-inch I <br /> 20 water main on Mound Road, twelve-inch water main on � <br /> 21 Route 51 . That twelve-inch main will be tapped and <br /> 22 will be looped. There is an improvement to the <br /> 23 residential property to the south. As a part of <br /> 24 this, we are going to connect a six-inch storm sewer <br /> 17 <br />�II <br />