Public Works <br /> DATE: 2/5/2016 <br /> MEMO: 2016-04 <br /> TO: Honorable Mayor Julie Moore Wolfe and City Council Members <br /> FROM: Tim Gleason,City Manager <br /> Richard G.Marley,P.E.,Public Works Director <br /> SUBJECT: Resolution Authorizing an Agreement with Chastain&Associates,LI.0 for Preliminary Design of the Meadowlark <br /> Neighborhood Drainage Improvement Project, <br /> City Project 2016-01 <br /> SUMMARY RECOMIVIENDATION: It is recommended that the City Council approve the attached Resolution authorizing the <br /> Mayor to sign,and the City Clerk to attest,a professional engineering services agreement between the City of Decatur and <br /> Chastain&Associates,LLC,to design the Meadowlark Neighborhood Storm Drainage Irnprovement Project for a fee not to <br /> exceed$76,689. <br /> PRIOR COUNCIL ACTION: This project was identified as the#1 priority in the City's 2009 Stormwater Master Plan. There <br /> have been no prior Council actions on this item. <br /> BACKGROUND: <br /> STORM DRAiNAGE PIZiORTIES: <br /> The 2009 Stormwater Master Plan addresses three main topics: <br /> 1. Stormwater Problem Area Prioritization <br /> 2. Regulation,Standards,and Policies <br /> 3. Stormwater Expenditures and Funding Mechanisms <br /> The Meadowlark Neighborhood Storm Drainage Improvement Project addresses item 1 in the Master Plan. <br /> Stormwater Utility Fund Projects <br /> In April,2014,the City Council approved a Stormwater Urility to provide a dedicated funding source to ir�rove known drainage <br /> problems and to improve maintenance on e�sting stormwater facilities. To date the following high priority projects are being <br /> designed: . <br /> 1. Baltimore Road Storm Sewer: The proposed Baltimore storm sewer will serve areas that ranked 3rd and 14th in the 2009 <br /> Master Plan. This project is being designed by Chastain&Associates as a cooperative venture with the planned <br /> reconstruction of Baltimore Road by the Macon County Highway Deparhnent. The new storm sewer designed for Baltimore <br /> Road will be sized to drain portions of the City within a reasonable distance of the new roadway. Timeline: Construction <br /> on Baltimore Road is scheduled to begin in 2017. <br /> 2. Nelson Park Neighborhood Storm Drainage: This project addresses the area ranked as the 2nd highest priority in the <br /> 2009 Master Plan. The project will separate storm drainage from the sanitary sewer system serving the neighborhood along <br /> with other storm drainage improvements. Timeline: These improvements are planned to be funded through a low interest <br /> loan administered by the Illinois Environmental Protection Agency,construction is scheduled to begin spring of 2017. <br /> 3. Meadowlark Subdivision: This project targets the neighborhood's ongoing storm drainage problexns which were ranked as <br /> the lst priority in the 2009 Master Plan. Drainage problems in Meadowlark include flooding in the major storm drainage <br /> ditch coursing through the neighborhood,storm sewer surcharging during heavy rains,and general street flooding. <br /> Timeline: These imQrovements are scheduled to begin in late 2017. <br /> BACKGROUND: <br /> On December 2, 2015, the Public Works Departrnent issued a request for proposals and qualifications from area engineering <br /> fim�s. Eleven fim�s responded to the City's request and 7 firms submitted formal proposals and statements of qualifications. <br /> Public Works Deparnnent staff reviewed the proposals and recommends Chastain&Associates, LLC as the firm best able to <br /> serve the City in designing the drainage improvements for the Meadowlark Neighborhood. Chastain is a local firm that has <br /> completed numerous design projects for the City. <br />