� + � t <br /> 5. Progress/Design Meetings. Meet with the City at the 30%, 60% and 90°/o design levels <br /> and conduct review meetings. Also meet separately to discuss new anionic polymer <br /> feed system and modifications to the existing lime system. <br /> 6. Opinion of Probable Construction Cost. At the 60% and 90°/o and final design levels, <br /> prepare an Engineer's Opinion of Probable Construction Cost. <br /> 7. Calculations. Prepare calculations for sizing of equipment, processes and feed <br /> systems necessary for the clarifier conversion. <br /> 8. Specifications. Prepare project specifications in CSI format using the 16 division <br /> format. Incorporate city of Decatur administrative document requirements as necessary. <br /> 9. Drawings. Prepare drawings to bid and construct the project. Drawings will be made <br /> available for client review at the 30%, 60% and 90% levels. Incorporate CLIENT review <br /> comments after each review. Finalize drawings for permitting and bidding phase. <br /> 10. Permitting. Complete and submit IEPA Permit Application and Engineer's Design <br /> Summary. <br /> 11. QA/QC Review. Provide review of calculations, plans and specifications for electrical, <br /> structural, civil and process mechanical work. <br /> 12. Project Management. Provide coordination between engineering disciplines, schedule <br /> and lead project meetings, correspondence with client and regulatory agency. <br /> Estimated Schedule <br /> The estimated completion for the construction plans and specifications is 12 months after <br /> receipt of a signed Agreement for Engineering Services authorizing CMT to proceed. <br /> A2 <br />