My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-15 PROFESSIONAL ENGINEERING SERVICES AGREEMENT SWTP CLARIFIERS
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-15 PROFESSIONAL ENGINEERING SERVICES AGREEMENT SWTP CLARIFIERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 9:52:11 AM
Creation date
2/18/2016 9:51:52 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-15
Res Ord Title
AUTHORIZING PROFESSIONAL ENGINEERING SERVICES AGREEMENT TO CRAWFORD, MURPHY & TILLY, INC. FOR SOUTH WATER TREATMENT PLANT EAST CLARIFIERS CONVERSION PROJECT
Approved Date
2/16/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ti � <br /> 11. Closeout Contract Documents. Prepare the engineer initiated closeout contract <br /> documents for construction phase closeout. <br /> 12. Record Drawings. Prepare AutoCAD record drawings indicating changes made <br /> from the "Issued for Construction" Conformed drawing set. These drawings will be <br /> made based on information, in part, provided by the CLIENT and by the contractor. <br /> One set of record drawings will be submitted to the CLIENT in PDF format along with <br /> three (3) full-size and three (3) half-size hard copies. <br /> A5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.