Laserfiche WebLink
Decatur City Plan Commission <br /> Apri14, 2002 <br /> Page Twelve <br /> Although the development will result in a somewhat higher density use, staff does not anticipate <br /> excess traffic or noise from this proposal. According to the petitioner, prospective residents will <br /> rnostly be transported to and from the site, i.e. there would not be an overall increase in vehicular <br /> traffic and there will be a single point of ingress and egress. <br /> Regarding the sanitary sewer and storm water drainage situation, the City's Engineering and <br /> Infrastructure Department will work with the petitioner on extending sewer mains to the <br /> proposed development and its neighborhood on a future date. In addition, the petitioner proposes <br /> extending a 12-inch corrugated metal pipe across Charles Street and drain it in their proposed <br /> storm sewer system to relieve some of the storm sewer drainage problems on Charles Street. <br />, The proposed development is consistent with the Decatur Urban Land Use Plan. Staff believes <br /> that the proposed use is compatible with the neighborhood and would be beneficial in terms of <br /> extension of utilities. Further, staff does not believe that the proposed use would create increased <br /> traffic or noise, nor will it negatively affect the locality and therefore recommends approval of <br /> the petition aS presented. <br /> Mrs. Sands asked if there are plans to upgrade the street. Ms. Ahmed stated that there are future <br /> plans to upgrade Charles Street. Mrs. Sands stated that it is the worst street in the city. Mr. <br /> Newell stated that he agreed and it was intended to be repaired this year. With the proposed <br /> development drainage issues need to be addressed first as water now stands on the road. Sanitary <br /> sewer will be extended to the development. The road would be repaired next spring or summer. <br /> The developer will be required to construct the portion of the site lower so that water can be <br /> conveyed. <br /> Mrs. Sands asked if the owner of this property is the sarne as the owner of the mobile home park <br /> Mr. Newell stated that the owner is the same and there has been difficulty getting him to <br /> cooperate regarding the drainage issues. The development will allow the opportunity to require <br /> that the improvements be made. <br /> Mr. Grady Wilkinson, Heritage Behavioral Health Center, was present and spoke for the petition <br /> stating that this type of development would help to address the housing problems for clients in <br /> treatment for mental illness. The mentally ill are often forced into substandard housing and Mr. <br /> Wilkinson knows of over 100 persons in this situation. He stated that it is a fact of life that the <br /> clients are discriminated against on the open housing market. The petition proposes small, <br /> manageable complexes with one bedroom, one story apartments. <br /> Mr. Wilkinson stated that he had been working with the Department of Housing and Urban <br /> Development and this location was found and an option taken on it. The project would be in <br /> three phases with the first complex to be built on Charles Street. There would be three apartment <br /> buildings with six units in each. The third building would have a seventh apartment for a <br />