My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
98-75 GRANTING SPECIAL PERMIT
COD
>
City Clerk
>
ORDINANCES
>
1998
>
98-75 GRANTING SPECIAL PERMIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2016 10:56:51 AM
Creation date
3/15/2016 10:56:50 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
98-75
Res Ord Title
GRANTING SPECIAL PERMIT - 2700 BLOCK NORTH JASPER STREET
Approved Date
11/30/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
corridor will be established between this fence and the Jasper Street Right-of-Way to provide an <br /> aesthetic visual buffer to the J�sper Street frontage. It is not considered that other boundaries of the <br /> site warrant extra-ordinary perimeter treatment other than security fencing. <br /> In recognition of the prevailing westerly winds and the impact of fine aggregate, in addition to the <br /> 15 foot high fence, a watering sprinkler system will be installed on the site to water down all <br /> aggregate ground surfaces and stockpiles during the night time to mitigate the impact of blowing . <br /> dust to adjacent properties. <br /> Two entrances onto Jasper Street aze proposed;the southern aligned with the south entrance into the <br /> Decatur Maintenance Garage on the east side of Jasper and the northern sufficiently offset from an <br /> extension of Cherches Drive. <br /> The truck tr�c using the site is anticipated to be interspersed throughout a normal business day and <br /> thus have minimal impacts to the A.M. and P.M.peak vehicular tr�c on the existing 4-lane Jasper <br /> Street, a major arterial designation on the Decatur Roadway System Plan. All aggregate trucks <br /> exiting the site will go through a wheel washing station to remove mud from the wheels and <br /> undercarriage of the trucks and thus have minimal tracking onto Jasper Street. Additionally, Jasper <br /> Street will be swept by a private street sweeping operation on a regulaz and as-need basis. <br /> With typical business operations only on regular business days and normal operating hours, lighting <br /> will be limited to security lighting only. All perimeters will be secured at night with gates at the <br /> entrances to prohibit vehiculaz entry and discourage pedestrian intruders. <br /> It is anticipated that no variances from the Decatur land development codes will be necessary from <br /> factors known at this time. Storm water detention is intended to be on-site with a dry basin <br /> developed within the guidelines and constraints of the City of Decatur Storm Drainage Policy. The <br /> general locations of the detention basin is shown on Exhibit C. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.