Laserfiche WebLink
TASK II <br /> � - The second task of this project is the actual completion of all site work. <br /> Mr. Hogan will assist in the notification and mobiliza.tion of subcontractors to the site. Mr. <br /> Hogan will oversee and document the completion of the Site Investigation Borings that will <br />� en r n tr leum contamination in the subsurface eolo at the <br /> document the pres ce o abse ce of pe o g gy <br /> site. <br /> Armor Shield will provide the drill rig and labor necessary to complete the site investigation <br /> borings. Mr. Hogan and Mr. Goodiel will be on-site to provide direction, oversight and document <br /> boring findings. Mr. Hogan will document soil properties, field observations and prepa.re samples <br /> to be sent to the laboratory for chemical analysis. Mr. Goodiel will provide direction to the <br /> drilling crew and assist in sample collection. Any and all underground utilities in the immediate <br /> area will also be identified and inspected for petroleum odors. <br /> If site conditions warrant, additional soil borings may be completed at property boundaries to <br /> investigate whether or not contamination has migrated off-site. <br /> Mr. Ho an will be res onsible for cka. 'n sam les, completing the Chain-of-Custody and �� <br /> g P Pa � g P <br /> shipping the samples to E.C. Labs in Farmersburg, Indiana for chemical analysis. <br /> 5 <br />