My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2000-216 AUTHORIZING SUBMISSION OF GRANT APPLICATION
COD
>
City Clerk
>
RESOLUTIONS
>
2000
>
R2000-216 AUTHORIZING SUBMISSION OF GRANT APPLICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 10:53:44 AM
Creation date
3/29/2016 10:53:40 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2000-216
Res Ord Title
AUTHORIZING SUBMISSION OF GRANT APPLICATION - CONDIT STREET OVERPASS - ILLINOIS COMMERCE COMMISSION
Approved Date
10/16/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pedestrian Ur�derpass Feasibility Study June 17, 1997 <br /> East Marietta Street and East Condit Street <br /> EIevating the sidewaik and installing the protective fence <br /> will create a " confined space" between the fence and the <br /> south retaining wall that wil� present space problems <br /> between pedestflans and bicycles that might use the walk. <br /> This restriction may cause pedestrians to seek alternate <br /> routes. <br /> Alternate SB will also require the installation of fencing <br /> north of Condit Street as noted in Alternate SA to prevent <br /> pedestrians from crossing the railroad. <br /> Alternate SC-Advantages Raising the south sidewalk and constructi.ng it ten feet wide <br /> will meet both ADA criteria and bicycle width criteria. This <br /> will totally separate the two from vehicular traffic. <br /> Additional lighting and repairs to the bridge joints, as noted <br /> in SA, wiil also apply to this alternate. <br /> Alternate SC-Disadvantages: �idening of the sidewalk will require removal of the north <br /> sidewalk and shifting the centeriine of the street to the <br /> north. This will require a transition in driving lanes at both <br /> entrances to the underpass. The transition would require <br /> additional striping and si�nage warning motorists. <br /> Elimination of the north sidewalk will require new cross <br /> watks at Clinton Street and Calhoun Street directing <br /> pedestrians to cross to the south side for passage throu�h <br /> the underpass. Additional traffic signs may be warranted to <br /> warn motorists of the cross walks. <br /> • wdening the south sidewalk and movin�the street to the <br /> north will require reconstruction of the storm drainage <br /> system located in the low point of the underpass. It will <br /> also require reconstruction of the street surface between <br /> Clinton Street and Calhoun Street for roadway transitions. <br /> Funding <br /> Determination of funding sources for this project is not part of this report. <br /> �P COT�701'LZl'lOfZ PaDe - IZ <br />
The URL can be used to link to this page
Your browser does not support the video tag.