Laserfiche WebLink
' <br /> ' d. Retrofitting and configuring existing equipment, iristruments, components <br /> and software. <br /> , e. Required testing of installed equipment, instruments, components and <br /> software. <br /> ' 2. Upgrades and improvements are to include, at a minimum: <br /> a. Installing a Programmable Logic Controller(PLC) in the RWPS to handle <br /> ' communications, controls, analog signals and alarm functions with the <br /> capability for future expansion. <br /> � b. Adding new systems to the RWPS to include: <br /> 1. Raw water instrument air pressure. <br /> ' 2. Raw water plant air pressure. <br /> 3. North raw water wet well level. <br /> ' 4. South raw water wet well level. <br /> 5. Building flood alarm. <br />'� ' 6. Building fire alarm (smoke and temperature). <br /> 7. Building intrusion alarm. <br /> ' 8. Building ambient temperature. <br /> 9. Raw water pump status. <br /> , 10. Raw water pump controls. <br /> c. Incorporating the online testing of conductivity and pH at the RWPS into <br /> , new system. <br /> d. Havin� the old associated controls removed and that portion of the <br /> ' existing Plant Control Console (PCC)refurbished. <br /> e. Interfacing the existinQ SCADA computer with the SWTP's Ronan <br /> annunciator alarm system and, as required, associated analog recorders <br /> ' and/or displays. <br /> f. Adding an alarm to the SCADA system for the loss of communication. <br /> ' g. Programming the Ciiy's Intellution software to graphically display key <br /> components and equipment on the system's computer screen. <br /> , 3. Consulting with City staff to obtain information and discuss project needs. <br /> 4. Submitting interim work products for review and approval by City staff. <br /> � B. Submitting to the City final plans and specifications in a reproducible format to have <br /> bidding documents printed for sale to solicit competitive bids from private <br /> contractors. <br /> , 9 <br /> � 03/O1/00 <br />