My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2000-77 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2000
>
R2000-77 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2016 9:37:43 AM
Creation date
3/31/2016 9:37:40 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2000-77
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT SOUTH WATER TREATMENT PLANT RAW WATER PUMP STATION - SCADA SYSTEM
Approved Date
6/5/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> ' d. Retrofitting and configuring existing equipment, iristruments, components <br /> and software. <br /> , e. Required testing of installed equipment, instruments, components and <br /> software. <br /> ' 2. Upgrades and improvements are to include, at a minimum: <br /> a. Installing a Programmable Logic Controller(PLC) in the RWPS to handle <br /> ' communications, controls, analog signals and alarm functions with the <br /> capability for future expansion. <br /> � b. Adding new systems to the RWPS to include: <br /> 1. Raw water instrument air pressure. <br /> ' 2. Raw water plant air pressure. <br /> 3. North raw water wet well level. <br /> ' 4. South raw water wet well level. <br /> 5. Building flood alarm. <br />'� ' 6. Building fire alarm (smoke and temperature). <br /> 7. Building intrusion alarm. <br /> ' 8. Building ambient temperature. <br /> 9. Raw water pump status. <br /> , 10. Raw water pump controls. <br /> c. Incorporating the online testing of conductivity and pH at the RWPS into <br /> , new system. <br /> d. Havin� the old associated controls removed and that portion of the <br /> ' existing Plant Control Console (PCC)refurbished. <br /> e. Interfacing the existinQ SCADA computer with the SWTP's Ronan <br /> annunciator alarm system and, as required, associated analog recorders <br /> ' and/or displays. <br /> f. Adding an alarm to the SCADA system for the loss of communication. <br /> ' g. Programming the Ciiy's Intellution software to graphically display key <br /> components and equipment on the system's computer screen. <br /> , 3. Consulting with City staff to obtain information and discuss project needs. <br /> 4. Submitting interim work products for review and approval by City staff. <br /> � B. Submitting to the City final plans and specifications in a reproducible format to have <br /> bidding documents printed for sale to solicit competitive bids from private <br /> contractors. <br /> , 9 <br /> � 03/O1/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.