Laserfiche WebLink
t� '• Attachment"A" -Scope of Services ciry of�ecatur,minois <br /> June, 1999 <br /> • Identify any specified reports required by each element of the PSM standard,and, <br /> identify reports recommended or suggested by City of Decatur personnel as reflected in <br /> the final PSM manual; <br /> • Give a presentation to facility personnel of the results to confirm the data forms and <br /> reports identified,and to insure that all PSM record keeping requirements have been <br /> addressed; ' <br /> • Prepare the database utilizing Microsoft's "ACCESS 97;" <br /> • Review all existing PSM records at the City and input all information into the fields/ <br /> tables identified;and <br /> • Conduct training in the developed database at the City's South Water Treatment Plant,or <br /> another site selected by the City. <br /> Process Safety Management is a dynamic management program. Once appropriate information <br /> has been developed and management procedures have been established,the facility must actively <br /> maintain and utilize the program in ongoing operations. <br /> B. R/SK MANAGEMENT PROGRAM - SCOPE OF WORK <br /> General <br /> The Clean Air Act required the U.S. Environmental Protection Agency(EPA)to promulgate <br /> regulations to prevent accidental releases of regulated substances and to reduce the severity of <br /> those releases that do occur. On June 20, 1996,EPA promulgated rules that apply to all <br /> stationary sources with processes that contain more than a threshold quantity of a regulated <br /> substance. Processes will be required to meet the requirements of one of three program <br /> categories,based upon: <br /> • The potential for offsite consequences associated with a worst-case accidental release; <br /> • Accident history; or <br /> • Compliance with the prevention requirements under OSHA's Process Safety Management <br /> (PSM)standard. <br /> Processes that have no potential impact on the public in the case of an accidental release will have <br /> minimal requirements. <br /> For other processes,the source(facility)will implement a risk management program that includes <br /> more detailed re uirements for hazard assessment, prevention, and emergency response. <br /> q <br /> Processes in industrial categories with a history of accidental releases,and processes already <br /> complying with OSHA's PSM Standard will be subject to a prevention program that is identical to <br /> parallel elements of the OSHA Standard. All other processes will be subject to streamlined <br /> prevention requirements. <br /> All sources must prepare a Risk Management Plan based on the risk management programs <br /> established at the source. T'he Plan must be submitted to a central point specified by EPA;the <br /> Plan will be available to state and local governments, and to the public. These regulations <br /> Donohue&Associates,Inc. PSM&RMP -South Water Treatment Plant <br /> Page A-6 <br />