Laserfiche WebLink
' , ATTACHMENT A <br /> � , <br /> 9.5 Develop guidelines for completing hydrologic/hydraulic analyses. <br /> 9.6 Identify stormwater quantity and quality problem categories. <br /> 9.7 Identify water quality enhancement techniques that can be applied to each watershed <br /> plan. <br /> 9.8 Identify alternatives analysis and evaluation methods. <br /> 9.9 Develop economic analysis methods including cost estimating approaches and cost <br /> effective evaluations. <br /> 9.10 Develop a budget level cost estimate for individual watershed planning units and a <br /> preliminary watershed planning schedule. <br /> 9.11 Prepare draft scope of work for the individual watershed planning phase. <br /> 9.12 Prepare a Watershed Planning Procedures report chapter. <br /> Deliverables <br /> • Key Objectives and Draft Scope for Individual Watershed Plans <br /> • Watershed Planning Implementation Priorities <br /> • Watershed Planning Budget Estimates and Schedules <br /> • Draft Watershed Planning Procedures Manual Report Chapter <br /> 10.0 Stormwater Graphic Files and Databases <br /> Overview <br /> This program will include identifying database needs and formats. These database tools will be <br /> developed to relate to existing or future GIS databases for future analysis and graphical displays. <br /> Some items of database information may include: <br /> • Watershed/Subbasin Boundaries <br /> • Hydrologic Soil Groups(A,B, C,D) <br /> • Complaint Locations/Categories <br /> • Land Use <br /> • CIP Project Locations <br /> • Project Prioritization Criteria and Tools <br /> Work Tasks <br /> 10.1 Inventory city data sources to determine the availability of data layers that are relevant to <br /> stormwater master planning. T'his data inventory effort will be integrated with the staff <br /> interviews. <br /> A-11 <br />