My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R97-146 ACCEPTING THE PROPOSAL AND AUTHORIZING AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1997
>
R97-146 ACCEPTING THE PROPOSAL AND AUTHORIZING AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 4:43:08 PM
Creation date
4/12/2016 4:43:07 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R97-146
Res Ord Title
ACCEPTING THE PROPOSAL AND AUTHORIZING THE EXECUTION OF AN AGREEMENT DEWITT COUNTY AND CISCO WELL FIELD STUDY CITY PROJECT 9717
Approved Date
10/20/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Stephen P. Swanson <br /> August 28, 1997 <br /> Page 8 <br /> Our people have a knowledge of the history and conditions of the aquifers and wellfields <br /> that only years of experience can provide. We feel this background allows us to provide <br /> you with more insight and expertise than is possible for a company without this <br /> backgound. <br /> In addition to our experience in both service areas, we offer more well construction <br /> expertise than can a typical consulting engineering company. Layne is a water , <br /> development company that offers both competent professional services as well as expert ' <br /> well and pump repair and installation services. As a result, we understand gound water <br /> resource development from the aquifer through the pump discharge. This provides us <br /> with the perspective to see a well field as an integrated system of an aquifer and water <br /> extraction system. We know what it takes to develop and maintain a wellfield and we <br /> know which modifications to the existing wellfields are the most practical and economic. <br /> Because we can see the wellfield as both an engineering consultant and as a well driller, <br /> we can provide you with the best aspects of a thorough understanding of the science and <br /> engineering of a wellfield as well as the practical aspects of well design and construction. <br /> PROJECT TEAM <br /> Layne has put together a project team of highly qualified experts to conduct this study. <br /> This team will consist of the following people: <br /> Dr. John Jansen, Chief Geoscientist, will act as project manager. <br /> Mr. Michael Lally, Principal Engineer,will provide engineering support for the <br /> project. <br /> Mr. Tiraz Birdie, Senior Engineer,will perform the modeling portion of <br /> the study. <br /> Mr. Tom Healy,Assistant District Manager,Layne-Western,Aurora, <br /> Dlinois, project manager for the DeWitt County wellfield drilling project will <br /> provide technical assistance with the analysis of well condition and wellfield <br /> operations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.