My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R97-107 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1997
>
R97-107 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 9:34:18 AM
Creation date
4/18/2016 9:34:17 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R97-107
Res Ord Title
AUTHORIZING AGREEMENT ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Approved Date
7/21/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-15-97 TUE 11:22 IEPA WATER FAX N0. 2177851225 P. 04 <br /> llQreemeM NO.�jQ� <br /> Design and construciioR of the BMPs shail be completed in accordartce with !he standards <br /> and specifications autlinQd in the NRCS Tachnia! Guide. 1f a variatiort from those <br /> standards and specifications is needed, the Reapient shaB provide written doCumet�tation <br /> to the Iliinois EPA e lairtin what the variance is and <br /> xP 8 , the reason that it is needed. The <br /> variation must be a roved b the Illinoi <br /> Pp s EPA;n advanoe of n <br /> Y a construdiort or n <br /> Y vegetatlo <br /> aciivities. <br /> Prior ro coruiructlon ot approved BMPs, the Reapient shall campiete a cortservation plart <br /> for� proporty upon which a BMP shail be instailed. Such ptans shail indude pesticide <br /> and nutrierrt mart errt Iarrs u� iden' o orts <br /> � agem p My pd for reducing aoil loss to no mora than <br /> T. Ali co N , . <br /> nse ation plans shal! be develo in aocor�danoe with Nlin � <br /> P� o�a T 2000' <br /> program and the standards and speafications oudined in the NRCS Tec:hnical Gu�,'de and . � <br /> bQ appro�ed by the loql Soii 8 Water Conservation Distrid. The Recipiertt shail invite <br /> paniapa�ng landowr:ers to evatuate ttxir farm using the FarmAsyst Program and assist the <br /> tandowners in performing t�e evaluation. <br /> Prior ta implemerttation of each BMP, the Recipient shaN coo�dinate with all appropriate <br /> �genciv�10�cure roquired permita and to minimizs the degr8detion of the loc�! resources <br /> during implementation. <br /> 6. Prior to tF►e implementation of a BMP, tha Recipient shatl enter irtto a contract with the <br /> owner of the BMP site to ertsur�e thei the installed BMPs shail be mamtairted for a minimum <br /> af ten (10) years. The Recipierit shall submit a draft copy of the contract to IUinois EPA by <br /> September 1, 7 997, a�d a finat copy will be submitted to the qlinois EPA within 30 days <br /> aiter our �eview of the draft copy. The RecipieM shall indude a spepf�c Operation and <br /> Mairrtenance Ptan (ObM Plan) for ihe BMP as p8R pf ttle conVacG The 08M Plan shall <br /> addrcss the followinfl: 1} mair�tenance of vegetation and hardware, 2) disposal of trash <br /> induding wood debris, 3j chemical treatment, end 4) the mechanism to providt finanaa! <br /> resources to implemer�t the Pfan. <br /> BEST MAPLA�EMENT PRAGTIGE IMPLEMENTATION <br /> 7. The Recipient will implement the Desigrts and constrtict ihe BMAs developed and <br /> approved in accordance with Items 5 a�d 6 of ihis AgresmQnt. The Recipient wiil <br /> complete the installation and consuuction of atl BMPs by June 30, 1999. <br /> Photographic stides docttmenting Design implerttentation and BMP constructiort will be <br /> completed and submitted by the Recipierit to the Illinois EPA by JuRe 30, 1999. <br /> PRnJFCT FV�4 �ATION AND R P�RT <br /> 8. The Recipierrt w;ll prepare a report explaininp the execution of the Projeci (i.e., pre and <br /> post cenditiona, type and location of irYtpkmented best management pr�cticQs, practice <br /> design, methods of practice installatiort) and evaluating the projecCs suxess, induding but <br /> not limited to improvements in water q�ality, habitat, and shoreline and bank stabilization, <br /> and public information. The report will document the projeci tasks and summarize the <br /> r�sulb of the projed. The repoR will include a discussion of the eftectiveness vf the <br /> education oomponer�t and ttt� cost-effecGveness of selected prac2ices in relatiortship to <br /> aRemative manayement str�begies. A drift of the npo�t witl be completed �nd �ubmitt�d <br /> by the Recipient to tNe tUinois EPA by April 30, 1999. The final report will be completed <br /> and fvve(5)copies submitted by ttte Recipient fo the Illinois EPA by June 30, 1999. <br /> page 3 vf 6 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.