Laserfiche WebLink
b. The second workshop will be to: <br /> i . Review the screening of treatment alternatives <br /> including costs and other factors, and reach a <br /> consensus on the remaining 3 to 5 alternatives for <br /> detailed evaluation. <br /> ii . The information and work completed prior to the <br /> workshop will include schematics layouts, condition <br /> assessments, process selections, cost estimates and <br /> other information as required for preliminary <br /> screening of alternatives. <br /> iii . Review and screen intake alternatives. <br /> iv. Review and discuss findings of the horizontal <br /> collector well favorability evaluation. Discuss if <br /> it is appropriate to recorrAnend proceeding with a <br /> collector well investigation. <br /> v. Review and discuss the use of an infiltration <br /> gallery to replace the existing raw water intakes. <br /> vi . Review and discuss treatment plant siting <br /> requirements. <br /> vii . Review and discuss minimum treatment capacity. <br /> Reach a consensus for the minimum treatment <br /> capacity. <br /> c. The third workshop will be to: <br /> i . Review and discuss the detailed evaluations of the <br /> final 3 to 5 treatment alternatives and present a <br /> ranking. <br /> S1W3:023 A-7 April 1, 1997 <br />