Laserfiche WebLink
6. ECAD Procedure and Environmental Assessment Report for the City <br /> approved alignment to include the following assessments: <br /> a.) Wetlands <br /> b.) Socio-Economic <br /> Bikeways, Sidewalks, Public Transportation, Public <br /> Agencies & Institutions <br /> c.) Land Use <br /> d.)Archaeological, Historical & Cultural Impacts <br /> e.) Water Resources <br /> f.) Water Quality <br /> g.) Air Quality <br /> h.)Noise <br /> I.) Construction <br /> j.) Alternatives <br /> k.) Coordination with involved agencies and City <br /> 1.) Report preparation with exhibits <br /> 7. Coordinate the Subconsultant's (SKS Inc.) work in providing a Preliminary <br /> Environmental Site Assessment(PESA) for the project and incorporation of <br /> the field analysis into the ECAD document. <br /> 8. Preparation of Intersection Design Studies in accordance with Illinois <br /> Department of Transportation(IDOT) guidelines at the following locations: <br /> A.) MLK& Hickory Point Road <br /> B. That the PCR and ECAD Documents for the project are to be furnished by the <br /> ENGINEER in accordance with Section A: Items 1-8 , inclusive, of THE ENGINEER <br /> AGREES and shall be in accordance with the current standard specifications and policies <br /> of the CITY and the Illinois Department of Transportation (IDOT) as applicable, it being <br /> understood that all such documents and drafts shall, before being finally accepted, be <br /> subject to approval by the CITY. Plan drawings, as required, in electronic format will be <br /> delivered in AUTOCAD 13 format. During the performance of the engineering services <br /> herein provided for, the ENGINEER shall be responsible for any loss or damage to the <br /> documents herein enumerated while they are in the ENGINEER'S possession and any <br /> such loss or damage shall be restored at the ENGINEER'S expense. <br /> C. To attend conferences to be held at the request of the CITY and visit the study site at any <br /> reasonable time when requested to do so by the CITY. <br /> D. That the PCR and ECAD Documents prepared by the ENGINEER in accordance with <br /> 2 <br />