Laserfiche WebLink
8. The M�TFOWER driver shall inspect the van eaclz morning and <br /> insure that the lights, wipers, brakes, turning signals and <br /> other systems are in proper working condition. Any defects <br /> shall be reported to DPTS. <br /> 9. MANPOWER shall report any accident, defect, or mechanical <br /> failure involving the van to the DPTS dispatcher as soon as <br /> possible, so that apprapriate action can be taken. <br /> 10. N�,NPOWER shall assist in the loading and unloading of handi- <br /> capped passengers, as well as their parcels and personal <br /> effects. <br /> 11. MANPOWER drivers will avoid any undue delay, either at point <br /> of pick-up or enroute and shall strive to pick up Program <br /> patrons within 5 minutes of the scheduled time. . <br /> 12. The van shall not wait for Program riders for more than five <br /> (5) minutes at any point beyond the scheduled pick up time. <br /> 13. MANPOWER shall acco�t for all patrons transported and shall <br /> maintain accurate trip sheets, and upon rPquest, other data <br /> which wi11 pravide sufficient information to pernnit evalua- <br /> tion of the Progr�n by the City, N�,1�TPC7WER Achninistrative <br /> Staf f and the Federal and State Goverrmients. <br /> 14. MANPOT�R shall permit the City, the U. S. Depart�nent of <br /> Transportation and the Illinois Depar�t�nent of Transportation <br /> to revie�a and/or audit all records pertaining to this Pro- <br /> gram. <br /> 15. The Program will observe the following holidays; <br /> New Year's Day I�abor Day <br /> • Memprial Day Thanksgiving Day <br /> July 4th Christznas Day <br /> These are in accordance with DPTS holidays. <br /> C. Payment for Services Rendered <br /> 1. The City shall pay NIANPOWER the sLun of $8.00 for each hour <br /> wnrked by each operator. <br /> 2. MANPOWER shall bill the City weekly for the services pravided <br /> by it. <br /> 3. Operator time slips will be furnished to the City by MANPOWER <br /> on a weekly basis. <br /> 4. Payment by the City for services rendered by Ng1NPOWER will be <br /> processed within 5 days of receipt of the billing. <br />