Laserfiche WebLink
to a portion of West Main Street damaged during a water main break. In total, 3.901ane miles of <br /> the City's 825 total lane miles will be rehabilitated as part of this project. <br /> The annual paving projects generally include a significant amount of patching to repair failed street <br /> sections. Crack sealing will also be performed as part of this project to help preserve streets and <br /> extend their lifespan. <br /> The proposed street list for Street Restoration is as follows (see attached location maps): <br /> SurFace Length Length <br /> Street Begin End Treatment (feet) (Lane <br /> Miles <br /> Jasper Cantrell St Wood St Mill and Overlay 2,638 2.00 <br /> Street <br /> Mound Spring Creek <br /> Road Bridge Woodford St Mill and Overlay 1,918 1.82 <br /> (West) <br /> 27`h Street CSX 25 feet north Overlay 25 0.01 <br /> Railroad of railroad <br /> Ocean CSX 103 feet east Overlay 103 0.04 <br /> Trail Road Railroad of railroad <br /> W. Main Church St Main St. Mill and Overlay 175 0.03 <br /> St. <br /> Total Length 4,859 3.90 <br /> The proposed locations for patching as part of the Street Restoration pro'ect are as follows: <br /> Quantity <br /> Street Location (Square <br /> Yards <br /> Wood Street Between MLK Jr. Dr. and Jasper St. 688 <br /> Monroe Street Between Eldorado St. and Leafland Ave. 1,295 <br /> Oakland Avenue 1155 N. Oakland Ave. 125 <br /> W. Main Street One Main Place Alley 57 <br /> N. Country Club Road Between US Rte 36 and Airport Rd. 641 <br /> Various Streets Greendell Neighborhood 298 <br /> Total Quantity 3,104 <br /> �2 � <br />