Laserfiche WebLink
� . . � - Appendix I <br /> private landowners, etc.) and will obtain from the Client information on water require- <br /> ments and possible cost sharing relationships with the villages of Argenta and Oreana. <br /> Pipeline routing alternatives will be reviewed with the Client to establish up to two <br /> routing plans to be used for costing. Harza will prepare report-quality exhibits of these <br /> alternatives based on USGS topographic maps. <br /> Subtask C.2 - Easement and Right-of-Way Requirements <br /> Harza's project team will offer technical advice to the Client's legal and real estate staff <br /> to determine the costs of obtaining rights-of-way, to advise on procedures to obtain <br /> easements and to develop pipeline routes that minimize both the costs and the delays <br /> anticipated in resolving property rights issues. To do this Harza will develop a list of <br /> easements to be acquired for proposed routes for purposes of cost appraisal. Costs of <br /> easements, specialty fees, and land acquisition will be estimated by Blank, Wesselink, <br /> Cook & Associates (BWC) as a subcontractor to Harza. <br /> Subtask C.3 - Economic Evaluation <br /> The two routing alternatives will be evaluated on the basis of their Net Present Value <br /> to determine the most economical option when estimated construction, property <br /> acquisition and operating costs are considered. Harza will develop pipeline sizing and <br /> pumping schemes for the two alternatives. Estimates of construction costs will be <br /> developed at the feasibility level (±25%) for the alternatives. Easement and land <br /> acquisition costs will be estimated based on information provided by BWC. Soils <br /> information as provided by the Client and the SCS will be used. Opera- <br />��� tion/maintenance costs will be determined using labor and power rates provided by the <br /> Client. Present worth will be determined based on a planning period, interest rates <br /> and a financing strategy agreed upon with the Client. <br /> Subtask C.4 - Pumping Operations � <br /> Estimating the cost of construction and operation of pipeline alternatives will require an <br /> analysis of projected pumping requirements to convey water from the well field to Lake <br /> Decatur. Harza will optimize the combination of pumping plant and pipeline design that <br /> will result in the lowest Net Present Value of project costs over the e�tpected life of the <br /> proj ect. <br /> A total of 220 manhours have been budgeted to complete all subtasks of Task C. <br /> s9ioia <br /> A893092N-APP.I I-S <br />