My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-14 AMENDING CITY CODE - CHAPTER 69 - ELECTRICAL CODE
COD
>
City Clerk
>
ORDINANCES
>
1994
>
94-14 AMENDING CITY CODE - CHAPTER 69 - ELECTRICAL CODE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2016 2:53:42 PM
Creation date
8/12/2016 2:53:41 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
94-14
Res Ord Title
AMENDING CITY CODE - CHAPTER 69 - ELECTRICAL CODE
Approved Date
3/7/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , <br /> Chapter 69 <br /> ( 5 ) Where feeders are to be used to provide <br /> ground-fault protection as permitted by NEC 215-9 , all <br /> Receptacles and lighting protected shall be labeled at the panelo <br /> (6) Where emergency lighting is required, adequat� <br /> numbers of battery back-up type fixtures shall be used so as to <br /> provide lighting for exiting. This shall be required in all <br /> installations including buildings supplied with alternate power <br /> supply such as generators or separate services. <br /> (7) When wiring hydromassage tubs, all 125v circuits <br /> shall be a minimum of 20 amperes. <br /> B. Existing buildings: <br /> (1) Other than dwelling: <br /> (a) All new wiring shall be installed as per this <br /> Electrical Code <br /> (b) When it is found that the electrical system <br /> in a structure constitutes a hazard to the occupants or the <br /> structure by reason of inadequate s�rvice, improper fusing, <br /> insufficient outlets , improper wiring or installation , <br /> deterioration or damage or for similar reasons, such defects <br /> shall be corrected. <br /> (c) Whenever a new service is installed, the <br /> electric meter shall be located on the outside of the building <br /> unless written approval from Illinois Power and the City <br /> Electrical Inspections Division is obtained. <br />, (d) Whenever construction remodeling calls for <br />
The URL can be used to link to this page
Your browser does not support the video tag.