Laserfiche WebLink
- 6 - <br /> Section 21. Before a permit is issued, the fee for <br /> the same computed as follows shall be paid: <br /> a. The minimum fee for any permit shall be <br /> $10 . 00 ; <br /> ' b. For installing a new service in or re- <br /> wiring an existing residence, $10 . 00 ; <br /> c. For installing equipment, excluding heat- <br /> ing, in a new residence, depending upon <br /> the capacity of the service : 100 amperes, <br /> $18. 00 ; 101 through 225 amperes , $25. 00 ; <br /> 226 amperes and over, $30. 00 ; <br /> d. For rewiring existing commercial or industrial <br /> structure or installing a new service therein, <br /> depending upon the capacity of the service : <br /> 100 amperes , $20 . 00 ; 101 through 225 amperes , <br /> $32 . 50 ; 226 amperes through 400 amperes , <br /> $40 . 00 ; over 400 amperes , $40 . 00 plus $6 .00 <br /> for each 200 amperes or part thereof over 400 <br /> amperes ; <br /> e. For installing electrical equipment in new <br /> commercial or industrial structures , a total <br /> fee computed by adding together the appro- <br /> priate amounts for service , fixtures , branch <br /> circuits , special equipment and motors deter- <br /> mined as follows : <br /> 1. For each service with the following capa- <br /> cities; up to 100 amperes , $ 3. 00; 101 <br /> through 225 amperes, $5. 00 ; 226 through <br /> 400 amperes , $7. 00 ; 401 through 600 amperes <br /> $10 . 00 ; over 600 amperes , $10 . 00 plus <br /> $2. 00 for each 200 amperes or part thereof <br /> over 600 ; <br /> 2. For all fixtures to be determined by <br /> the number thereof: $6 . 00 for any <br /> number through 20 and 10� each for <br /> additional fixtures over 20 ; <br /> 3. For all branch circuits regardless <br /> . of voltage to be determined by the <br /> number thereof: 80� each for the <br /> first 12 circuits and 20¢ each for <br /> additional circuits over 12 ; <br />