My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7154 AMENDING ELECTRICAL CODE
COD
>
City Clerk
>
ORDINANCES
>
1976
>
7154 AMENDING ELECTRICAL CODE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2016 10:55:16 AM
Creation date
10/7/2016 10:55:16 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
7154
Res Ord Title
AMENDING ELECTRICAL CODE
Approved Date
9/20/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v , ' . <br /> -2- <br /> of $10.00 for each reinspection. The same three inspections <br /> as set out herein shall be made when extensive rewiring is <br /> done in existing structures. All electrical work shall be <br /> finally inspected and approved before the Certificate of <br /> Occupancy is eligible for issuance. Application for such <br /> Certificate shall be made by the owner or builder, as the <br /> case may be after being advised that the electrical work is <br /> completed and ready for final electrical inspection. In the <br /> event the electrical work is not completed or fails to conform <br /> with the provisions of this code, a reinspection permit shall <br /> be obtained and the work completed or corrected, and Certificate <br /> of Occupancy withheld until ors reinspection or subsequent <br /> reinspection such work is found to so conform. <br /> * * * * * * <br /> 20 . The utility company may connect the electrical <br /> service to the structure when the service is installed perma- <br /> nently on the structure and upon order of the Inspection <br /> Division. When the service is connected to the structure, <br /> only code conforming circuits shall be activated. Al1 <br /> circuits activated at this time shall be considered construc- <br /> tion circuits and shall be protected by ground fault interruptor <br /> breakers . The driven ground shall be installed and the service <br /> distribution panel or panel covers shall be installed. The <br /> service connection at this time will not delete the rough-in <br /> inspection as required in Section 19 , but only shifts the <br /> sequence of inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.