My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-01 Contract with SAK Construction 7th Ward Sewer Rehabilitation Project
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-01 Contract with SAK Construction 7th Ward Sewer Rehabilitation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:37:25 PM
Creation date
1/20/2017 3:38:47 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-01
Res Ord Title
Contract with SAK Construction for 7th Ward Sewer Rehabilitation Project CP 2015-07
Department
Public Works
Approved Date
1/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construed as a waiver of the Contractor's obligation to obtain and keep in force the <br /> required insurance. <br /> AD2-6 SPECIAL PROVISION—MANHOLE REHABILITATION <br /> 6.01 Add the following section to Special Provision SP-4,part 4.04: <br /> (x)Manhole SW-06. <br /> (1) Remove and replace internal drop pipes as necessary for CIPP placement <br /> ' and manhole rehab. <br /> (2) Apply anti-corrosion coating and non-shrink grout on exposed rebar at two <br /> 4"pipe penetrations. <br /> (3) Fill 1'x 2'void on SW side of manhole with non-shrink grout. <br /> AD2-7 NEW SPECIAL PROVISION-PAVEMENT PATCHING, SPECIAL <br /> 7.01 Add the following Special Provision: <br /> ' SP-24 PAVEMENT PATCHING,SPECIAL <br /> 24.01 Scope. This work shall consist of removing existing pavement structures <br /> and constructing pavement patches in accordance with Exhibit D of the <br /> Special Conditions, Section 442 of the IDOT Standard Specifications, and <br /> this Special Provision. <br /> 24.02 General. This work shall be performed in accordance with the IDOT <br /> Permit contained in Exhibit D and the applicable parts of Section 442 of the <br /> IDOT Standard Specifications. <br /> 24.03 Measurement and Payment. Pavement removal and replacement will be <br /> measured for payment as square yards of patching in place, and the area <br /> computed in square yards. The work shall be paid for at the contract unit <br /> price for PAVEMENT PATCHING, SPECIAL. <br /> Saw cuts, dowel bars, reinforcement bars, and pavement tie bars shall not <br /> be measured for payment, but shall be considered as included in the <br /> contract unit price for this work. <br /> I � <br /> AD2-8 NEW SPECIAL PROVISION-ABANDON SEWERS <br /> 1 8.01 Add the following Special Provision: <br /> 25.01 Scope. This work shall consist of abandoning existing sewers in- <br /> place. <br /> 25.02 General. The sewer to be anbandoned shall be partially blocked at <br /> the downstream end with a poured-in-place concrete plug or by other <br /> suitable means acceptable to the Engineer from the flow line to within <br /> 1 CITY 2015-07/BGM 15-046C ADD2-2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.