Laserfiche WebLink
2 inches of the pipe crown. The upstream end shall be partially <br /> blocked in a similar manner, but leaving sufficient room between the <br /> ' top of the blocking and the pipe crown to allow controlled low- <br /> strength material to be pumped into the sewer. <br /> CLSM shall be pumped into the sewer until the material starts <br /> overflowing the downstream end, at which time the downstream plug <br /> shall be completed. Continue placing CLSM until it reaches the <br /> 1 upstream end, at which time the upstream plug shall be completed. <br /> 25.03 Measurement and Payment. This work will be measured for payment <br /> ' as feet of sewer abandoned in place. Concrete plugs and controlled <br /> low-strength material shall not be measured for payment. <br /> The work will be paid for at the contract unit price per foot for <br /> ABANDON SEWERS of the diameter specified. <br /> ' AD2-9 WORK RESTRICTIONS IN FAIRVIEW PARK <br /> 9.01 No construction activity is allowed on the Decatur Park District property of Fairview <br /> ' Park between the dates of May 15th and August 31St. A note has been added to the <br /> appropriate plan sheets. The Contractor should prepare his construction schedule <br /> accordingly. <br /> ' AD2-10 PROJECT PLAN SHEETS <br /> 10.01 The following plan sheets have been revised and are included as part of this <br /> Addendum: Sheets Nos. 3, 4, 14, 20,21, 22, 23, 26,27,28, 29, 35, 36, 38, 39,42. <br /> AD2-11 CLARIFICATION OF MANHOLE REHABILITATION SCHEDULE <br /> 11.01 The "Fiber Reinforced ShotcreteS Vertical " and the "Fiber Reinforced <br /> ( q Ft) <br /> 1 Shotcrete (Pipe Sq Ft)" are not the entire amount of shotcrete work. Additional <br /> quantities will be required for varioius structures and manholes identified in the Special <br /> Provisions. <br /> The"Other Work By Special Provision"column identifies those structures and manholes <br /> that require non-standard work not readily summarized in the Schedule. Such work is <br /> detailed only the Special Provisions. <br /> Any quantities shown on the Manhole Rehabilitation Schedule are IN ADDITION TO <br /> the work described in the Special Provision for Structure Rehabiliation and the Special <br /> Provision for Manhole Rehabilitation. <br /> CITY 2015-07/BGM 15-046C ADD2-3 of 4 <br />