My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-01 Contract with SAK Construction 7th Ward Sewer Rehabilitation Project
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-01 Contract with SAK Construction 7th Ward Sewer Rehabilitation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:37:25 PM
Creation date
1/20/2017 3:38:47 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-01
Res Ord Title
Contract with SAK Construction for 7th Ward Sewer Rehabilitation Project CP 2015-07
Department
Public Works
Approved Date
1/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' AD2-12 BYPASS PUMPING AT STRUCTURE NO. 7 <br /> 12.01 Bypass pumping will not currently be allowed to the other pipes in this structure. <br /> Bypass pumping may be routed at the Contractor's discretion to the Sanitary District <br /> Sewer in nearby Manhole 45-90, which ties back into the 71` Ward Sewer at <br /> 1 Structure No. 4. The Sanitary District must be notified at least two days prior to any <br /> such bypass. <br /> AD2-13 ADDENDUM NO.2 <br /> 13.01 This Addendum No. 2 consists of Articles AD2-1 through AD2-13. <br /> BGM&Associates, Inc. <br /> ' 5130 Hickory Point Frontage Road, Suite 2 <br /> Decatur, Illinois 62526 <br /> CITY 2015-07/BGM 15-046C ADD2-4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.