STORM DRAINAGE PRIORITIES: <br /> The 2009 Stormwater Master Plan addresses three main topics: <br /> 1. Stormwater Problem Area Prioritization <br /> 2. Regulation, Standards, and Policies <br /> 3. Stormwater Expenditures and Funding Mechanisms <br /> In April, 2014,the City Council approved a Stormwater Utility to provide a dedicated funding source <br /> to improve known drainage problems and to improve maintenance on existing stormwater facilities. <br /> The Nelson Park Neighborhood Combined Sewer Separation Project addresses item 1 above by <br /> targeting the Nelson Park Neighborhood's ongoing storm drainage problems which were identified as <br /> the #2 storm water mitigation priority in the City's stormwater master plan. The project is the first <br /> master plan project to be constructed with stormwater utility funds. The project will also separate <br /> sanitary sewage from storm water drainage. Separating the two types of sewer flow will reduce <br /> basement backups and combined sewer overflows into the Sangamon River. <br /> Project Letting <br /> The project contract documents were prepared by Blank, Wesselink, Cook&Associates, Inc. <br /> (BWC). The project includes the installation of approximately 12,000 lineal feet of storm sewer <br /> ranging in size from 12"to 48", associated manholes and inlets, street reconstruction and repair, site <br /> restoration and all other miscellaneous work for the new storm sewer system. The project was <br /> advertised on February 15, 2017, a pre-bid meeting was held on March 2,2017, and bids were <br /> opened on March 30, 2017. The results of the letting are as follows (bid tabulation attached): <br /> Compared to <br /> Engineer's Estimate <br /> Bidder Bid Price Over(-Under) <br /> Entler Excavating Company, Inc. $3,503,727.83 (15.41%) <br /> Otto Baum Company, Inc. $3,826,059.11 (7.63%) <br /> Freesen A Division of United Contractors <br /> $3,980,072.72 (3.91%) <br /> Midwest <br /> Engineer's Estimate $4,142,032.50 ---------- <br /> Entler Excavating Company, Inc.,provided the lowest responsible bid for the proposed work. Entler <br /> Excavating has completed several sewer projects for the City, including the Miscellaneous Sanitary <br /> and Storm Sewer Improvement Projects for the previous two years. BWC has investigated their work <br /> record and has provided a recommendation, (attached), stating that Entler Excavating Company, Inc. <br /> is able to complete the work as specified. <br /> Contractors for City Projects shall comply with City Code Chapter 28, Article 10, "Minority <br /> Participation Goals for Public Works Contracts." <br /> Contractors for City projects shall make a good faith effort to comply with the following minimum <br /> goals: <br /> 1. Ten(10)percent of the total dollar amount of the contract should be performed by Minority <br /> Business Enterprises if subcontracting opportunities are available; and, <br /> 2. Eighteen (18)percent of the total hours worked should be performed by minority workers. <br /> — 2 — <br />