R2017-53 Contract with Entler Excavating for Nelson Park Neighborhood Combined Sewer Project CP 2012-22
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-53 Contract with Entler Excavating for Nelson Park Neighborhood Combined Sewer Project CP 2012-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 9:35:18 AM
Creation date
4/19/2017 2:39:30 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-53
Res Ord Title
Contract with Entler Excavating for Nelson Park Neighborhood Combined Sewer Separation Project CP 2012-22
Department
Public Works
Approved Date
4/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subcontracting is not required for a City project. Entler Excavating will be subcontracting 52%of <br /> the work, 2%of which will be with a minority subcontractor. Entler provided documentation that <br /> demonstrated a good faith effort toward complying with the goals. <br /> This project will be completed in accordance with the Federal Davis Bacon Wage laws. Upon <br /> approval of the contract by the City Council,the contractor will receive a"Notice of Intent to <br /> Award." The contract will be forwarded to the IEPA for formal loan approval. Upon receiving <br /> approval for a loan from the IEPA, and a contract bond and insurance from the Contractor,the City <br /> will formally award the contract and issue a notice to proceed with the work. Staff recommends that <br /> the City Council approve a contract with Entler Excavating Company, Inc.,to perform the Nelson <br /> Park Neighborhood Combined Sewer Separation Project. <br /> Project Funding Through the Water Pollution Control Loan Program <br /> Awarding the Nelson Park Neighborhood Combined Sewer Separation Project provides the IEPA <br /> with actual costs to prepare the final documents that will secure a low interest loan through the Water <br /> Pollution Control Loan Program. The loan rate is expected to be 1.75%payable over a 20 year <br /> period beginning at the conclusion of the project. The total loan request is summarized below: <br /> Work Item Project Estimate <br /> Design Engineering $244,000 <br /> Loan Eligible Construction Cost $3,443,354.19 <br /> 3%Construction Contingency $103,300.63 <br /> Loan Ineligible Construction Costs* $60,373.64 <br /> Construction Engineering $318,985 <br /> Total Estimated Project Cost $4,170,013.46 <br /> Total Estimated IEPA Loan Amount $4,109,639.82 <br /> *IEPA has identified sidewalk removal and replacement for the <br /> installation of detectable sidewalk warnings as ineligible <br /> construction costs. Costs for this work will be covered by the Local <br /> Motor Fuel Tax Fund <br /> As noted above, upon Council authorization of the contract,the City will issue a Notice of Intent to <br /> Award to the contractor. The IEPA will review, approve the contracts and authorize a loan to cover <br /> the project. Upon formal approval of the loan by the IEPA,the City will issue a Notice to Proceed to <br /> the contractor. <br /> SCHEDULE: <br /> Bids opened by the City March 30,2017 <br /> City Council receives and approves bids April 17, 2017 <br /> Notice of Intent to Award issued to contractors April 18, 2017 <br /> IEPA approves bids and authorizes final award May 2017 <br /> — 3 — <br />
The URL can be used to link to this page
Your browser does not support the video tag.