My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-56 Contract with Dunn Company for Street Restoration CP 2017-08
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-56 Contract with Dunn Company for Street Restoration CP 2017-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 11:44:44 AM
Creation date
4/19/2017 2:46:20 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-56
Res Ord Title
Contract with Dunn Company for Street Restoration CP 2017-08
Department
Public Works
Approved Date
4/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Surface Length Length <br /> Street Begin End Treatment (feet) (Lane <br /> Miles <br /> Mound Woodford St IL Route 48 Mill and Overlay 6,964 5.46 <br /> Road <br /> Total Length 6,964 5.46 <br /> The proposed locations for crack sealing as part of the Street Restoration project are as follows: <br /> Street Location Length <br /> feet <br /> N/S Main Street Between Wood St. and Eldorado St. 1,930 <br /> North Street Between Main St. and Franklin St. 753 <br /> William Street Between Main St. and Franklin St. 747 <br /> Prairie Street Between Alley west of Main St. and Water St. 536 <br /> North Park Street Between Water St. and Franklin St. 320 <br /> South Park Street Between Water St. and Franklin St. 315 <br /> E/W Main Street Between Church St. and Franklin St. 1,128 <br /> Total Length 5,729 <br /> Letting Results <br /> The project scope and specifications were prepared by the Engineering Division and approved by <br /> the Illinois Department of Transportation(IDOT) for the use of Motor Fuel Tax funds. The project <br /> was advertised on March 29, 2017 and April 5, 2017, and bids were opened on April 10, 2017. The <br /> results of the letting are as follows (bid tabulation attached): <br /> Bidder Bid Price Compared to Engineer's Est. <br /> Over Under <br /> Dunn Company $678,694.07 (0.57%) <br /> Engineer's Estimate $682,611.85 ------ <br /> Two contractors took out bid packages for the Street Restoration Project,Dunn Company and <br /> Bodine Electric of Decatur. Dunn Company provided the lowest responsible bid at 0.57%below <br /> the engineer's estimate. Dunn Company has successfully completed many jobs of this type for the <br /> City. Following approval of the Mayor and City Council,the bid tabulation will be forwarded to <br /> the Illinois Department of Transportation for final approval in accordance with the rules governing <br /> the disbursement of State Motor Fuel Tax funds. <br /> —2— <br />
The URL can be used to link to this page
Your browser does not support the video tag.